The starting point

A portfolio sale needs consistent site-level records and a clear consolidated view. Separate mature and ramping sites, explain shared overhead and property arrangements, and test whether selling together or in groups best meets your goals. A portfolio premium is not automatic.

In this guide

Build two views of earnings

Prepare standalone site results and a consolidated result that reconciles to them. Use a consistent chart of accounts and period. Explain shared management, marketing, maintenance and administrative costs.

Show the allocation method and the underlying unallocated expenses. A buyer may change the structure, but not every central cost disappears. Keep potential synergies distinct from historical earnings.

Describe each site’s maturity

Record opening or acquisition dates, major remodels, temporary closures, current operating trends and local competition. A mature site and a newly opened site need different analysis.

Present forecasts separately and state the assumptions behind ramp-up. Avoid using a mature-site multiple across a portfolio without examining differences in evidence, condition and risk.

Map property and obligations

For each location, identify owned versus leased property, tenant and owner entities, debt, guarantees, lease term, options and transfer requirements. A single difficult consent can affect the package’s timing.

Include equipment condition and capital needs by site. A consolidated capital estimate can hide a location that needs immediate investment.

Compare transaction configurations

Selling all sites may simplify some parts of the process or appeal to certain buyers. Selling in groups can reach different buyers but add coordination, stranded overhead and timing risk.

Model proceeds, retained costs, remaining guarantees and the effect on any sites you keep. Do not assume the sum of hypothetical individual prices is achievable simultaneously.

Example: site earnings versus portfolio earnings

Illustrative figures: three sites report $300,000, $250,000 and $150,000 of earnings before central costs. Their sum is $700,000. If the group incurs $180,000 of central costs not already included at the sites, consolidated earnings are $520,000 before any further normalization. Calling $700,000 group EBITDA would omit the cost of running the group.

Label intercompany charges and eliminate them consistently. If site statements already include central allocations, do not subtract the same overhead again. Provide both the allocation schedule and the consolidated reconciliation so a buyer can replace assumptions without losing track of the reported result.

Model the business left behind in a partial sale

A proposal for selected sites needs a retained-business plan. Selling a location may remove its earnings without removing the same proportion of regional management, maintenance, software or office cost. Determine which contracts can be resized, which costs are avoidable and which obligations remain.

Scroll sideways to compare columns. You can also focus the table and use the arrow keys.

Questions for a partial portfolio sale
QuestionEvidence or decision needed
What happens to shared staff?Roles required by each group and any agreed transition service
Can systems be separated?Provider-approved accounts, data boundaries and migration responsibilities
Which obligations remain?Debt, guarantees, leases and contracts mapped to their actual parties
Will retained locations remain viable?A standalone forecast with retained overhead and stated assumptions
Can all selected sites close together?Consent and condition status by location; treatment of delayed sites

Do not count an expected overhead reduction until there is a supportable plan. Forecast savings and buyer synergies belong in separate scenarios, not in the historical earnings reconciliation.

Continue the three-site illustration above. If the $300,000 site is sold and only $40,000 of the $180,000 central cost can actually be removed, the retained sites produce $250,000 + $150,000 − $140,000 = $260,000 before further normalization. The retained result is not $400,000, and central cost does not automatically fall in proportion to the locations sold. This assumes the starting site figures exclude central costs; verify the avoidable-cost plan and any new standalone expenses before using the scenario.

Make site exceptions visible before diligence

Create a short exception register for differences that matter: an expiring lease, an immature membership cohort, a closed bay, a major equipment quote or an unresolved permit question. Give each issue an owner, supporting file and next action. Update the register when facts change.

This lets the buyer assess the portfolio without discovering material exceptions one site visit at a time. It also helps you compare an all-or-nothing offer with a proposal that permits individual site exclusions. Have advisers explain how any exclusion affects price, retained debt, guarantees and the ability to complete the rest of the transaction.

Prepare integration and transition

  • Site-level financial and membership reporting.
  • Central systems, contracts and allocation methods.
  • Management responsibilities and succession coverage.
  • Property, debt and consent matrix.
  • Capital needs and material issues by location.
  • Staff, POS and customer communication plan.

A buyer evaluating the portfolio should be able to trace the consolidated story to each operating site. The strength of that evidence is more useful than a blanket claim that scale always earns a premium.

This guide provides general education. Your documents, jurisdiction and circumstances determine the advice you need. Figures labelled illustrative are examples, not reported transactions or market benchmarks.